Hanson Logo
Log on or Register for MyHanson Information
you are here: Project review  |  Sino Iron Ore Project
 
This UltimateJQueryHeader Module must be configured before use, please:
  1. Change the Settings of the module where you must add the height.
  2. Create one or more slide for displaying in the header by the option Manage Side.
For more help on how to configure the Module, please read the Manual available for download.
 
Project review Minimize
Sino Iron Ore Project, Western Australia Minimize

Customer: CITIC Pacifing Mining
Construction Sector: Mining Industry

  • The massive Sino Iron project being developed at Cape Preston is located 100 kilometres south west of Karratha
  • With an estimated Value of $5.2 billion, it is currently the largest magnetite mining and processing operation under construction in Australia
  • A concrete component in excess of 300,000m3 is needed and Hanson is one of 3 concrete producers on the project, contracted directly to MCC Mining
  • Over a 15 month production period, Hanson has supplied 53,000m3 of concrete
  • The mobile plant is located 10km from the construction site, containing a single head Porta- Batch system, incorporating two 70 tonne portable silo's, capable producing up to 60m3 of concrete per hour
  • Hanson also operated a full-time NATA accredited annex laboratory to meet the project requirements

 

 

 

 

 

 

 

 

Quick links Minimize
Copyright 2012 Hanson Construction Materials [ Terms Of Use ] [ Privacy Statement ]